SRNE lists up to 135A for battery discharge, PV charging and grid/generator charging paths on the AEP 6kW. These limits describe separate operating paths and should not simply be added together. In a 48V inverter installation, the battery BMS, conductors and protection must support the required current. The battery’s own recommended charging current may also be lower than the inverter maximum, so configuration should follow the battery specification rather than automatically using 135A.