SRNE lists UL1741 and IEEE1547.1-2020 together with CEC, Rule 21, HECO, FCC 15 Class B and RoHS on the product information for the HESP 8-12kW US series. These references can help installers screen a project before detailed permitting or interconnection review. They do not replace local approval. A 240V inverter installation may still be subject to utility rules, local code requirements and authority-having-jurisdiction review in the specific project location.